Before optimization, it can be seen that the maximum load volume of the vehicle 2 is greater than its maximum capacity set at 3 m3. This is a situation known as « overload capacity ». The last destination is accepted in the vehicle route. :numref:`app-before_optimize_vehicle_2_plan`.
Before optimization, it can be seen that the maximum load volume of the vehicle 2 is greater than its maximum capacity set at 3 m3. This is a situation known as « overload capacity ». The last destination is accepted in the vehicle route. :numref:`app-before_optimize_vehicle_2_plan`.
Avant optimisation, on constate que le volume maximal en charge du véhicule 2 est supérieure à sa capacité maximale fixée à 3 m3. Il s'agit d'une situation dite « hors capacité véhicule ». La dernière destination est acceptée dans la tournée véhicule. :numref:`app-before_optimize_vehicle_2_plan`.
:numref:`app-before_optimize_vehicle_2_plan`.
:numref:`app-before_optimize_vehicle_2_plan`.